Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
- home > Supply > Fuzhou scaffolding rental | Fuzhou Mingguang scaffolding (certified) | Fuzhou scaffolding
| Information Name: | Fuzhou scaffolding rental | Fuzhou Mingguang scaffolding (certified) | Fuzhou scaffolding |
| Published: | 2015-01-27 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Second, the reference 1. "water conservancy and hydropower construction and installation work safety technical regulations" (SD267-88); 2. "construction steel tubular scaffolding safety specifications" (JGJ130-2001). Third, the design requirements (a) Basic requirements 1. Important scaffolding construction plan must be developed Fuzhou scaffolding manufacturers to develop safety measures when necessary. Effective measures should be taller than 50m double pipe scaffolding pole, rope stayed, unloading and other segments; 2. height of 25m above the scaffold must steel tubular scaffolding, the single pole scaffold height should be controlled within 50m Fuzhou scaffolding for sale, and separately designed. (B) Remove the safety requirements 1. Remove the order should be carried out step by step from the top down, up and down at the same time work is strictly prohibited. 2. Remove the stinger, connectors, and other materials Fuzhou springboard scaffold rental, scaffolding should be humping Fuzhou, throwing down is strictly prohibited. Has been discharged (solution) to open scaffold rods, plates, should all at once Chai Wan. 3. All wall pieces should follow step by step removal of scaffolding, the first non-whole floor or wall pieces and then removed several layers of dismantling scaffolding; segment elevation removal should not exceed two steps, such as height should be added even greater than the two-step Wall pieces reinforcement. Fuzhou scaffolding rental | Fuzhou Mingguang scaffolding (certified) | Fuzhou, Fuzhou Mingguang scaffolding provided by the steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) (http://www.fzmgjsj.com) is Fuzhou, a leader in site construction materials, over the years, the company is implementing the scientific management, innovation and development, honesty trustworthiness policy, and satisfy customer needs. In Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create scaffolding Fuzhou Mingguang a better future. You can also access (http://www.fzmgjsj.com/supply_details_41503208.html), for more information about the company. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

