Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
- home > Supply > Fuzhou scaffolding installation | Fuzhou Mingguang scaffolding (certified) | Fuzhou scaffolding
| Information Name: | Fuzhou scaffolding installation | Fuzhou Mingguang scaffolding (certified) | Fuzhou scaffolding |
| Published: | 2015-03-12 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | 6. wooden rod: # 8 wire with four, erection of (a) the erection of pre-preparation 1. technical staff to carry out the erection and site management technology, safety tests, Fuzhou scaffolding scaffolding rental company, did not participate in tests, the officer shall not participate in the erection operations; scaffolding erection of scaffolding design personnel must be familiar with the contents. 2. The quality of steel, fasteners, scaffold boards, ladders, safety nets and other materials and quantity of inventory, inspection, acceptance, to ensure that the design meets the requirements of Fuzhou scaffolding, substandard components and parts not use scaffolding rental company in Fuzhou, material missing Fuzhou scaffold erection when not lease, different materials, different specifications of materials, components and parts may not be used on the same scaffold. 2. The steel pole bracket template structure should meet the following requirements: (1) shall be provided at the bottom of each pole base or pad. (2) must be set vertical and horizontal sweep shot. Vertical sweep shot should be fixed on the pole right angle fasteners from the base distance of not more than 200mm; transverse sweep shot right angle fasteners should be fixed at the bottom of the pole next to the vertical sweep shot. When not at the same height on the pole base, it must be the height of the vertical sweep shot to the lower pole and extend across two fixed height difference should be less than 1m. Distance from the axis of the slope by the pole to the top of the slope should be greater than 500 mm. Fuzhou scaffolding installation | Fuzhou Mingguang scaffolding (certified) | Fuzhou, Fuzhou Mingguang scaffolding provided by the steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) is Fuzhou, a leader in site construction materials, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create scaffolding Fuzhou Mingguang a better future. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

