Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
- home > Supply > Fuzhou Fuzhou Mingguang scaffolding hire scaffolding _ (certified) _ Fuzhou scaffolding
| Information Name: | Fuzhou Fuzhou Mingguang scaffolding hire scaffolding _ (certified) _ Fuzhou scaffolding |
| Published: | 2015-03-16 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | First, the term (a) classification scaffolding scaffolding for the construction or installation of construction and erection of the material, as well as temporary structures rack stacker with construction work. 1. Press the materials used: two wooden scaffolding, steel scaffolding and ladder. 2. Can Move: Mobile scaffolding and into fixed scaffolding. 3. Press the nature of the construction of: Scaffolding and install scaffolding divided. 3. Steel scaffold boards should be thick steel plate 3 2 ~ 3mm Fuzhou scaffolding installed to the length of 1.4 ~ 3.6m, width 23 ~ 25cm, 5cm rib height is appropriate, both ends of the device should be connected, the board has a non-slip surface Fuzhou hole scaffolding, where there are cracks, distortion shall not be used. 4. wire: 8 # to 10 # wire. 5. The use of a rope ladder: hemp or coir rope diameter ф30 above, the bearing capacity to meet the requirements. 6. Do not use wooden rods and wooden scaffold boards. (3) the underlying pitches should be less than 2 m. (4) In addition to the top of a long pole connected to the lap top can step outside Fuzhou scaffolding for sale, the remaining layers connectors must be used in each step (technical feasibility studies must go through a special case when using lap) docking fastener connection. Pole docking fastener should be staggered: two adjacent pole connector should not be set in sync within Fuzhou scaffolding pipe, two synchronous inside compartments separated by a Pole joints staggered in height direction a distance of not less than 500 mm; Each joint center to the master node distance of not more than 1/3 of pitches; lap length of not less than 1m, should be fixed at least two rotating fastener, fastening the ends of the rod end to cover the edge distance of not less than 100mm. Fuzhou Fuzhou Mingguang scaffolding hire scaffolding _ (certified) _ Fuzhou, Fuzhou Mingguang scaffolding provided by steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) is Fuzhou, a leader in site construction materials, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create scaffolding Fuzhou Mingguang a better future. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

