Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
| Information Name: | Fuzhou Full scaffolding | scaffolding | scaffolding Fuzhou Mingguang |
| Published: | 2015-03-22 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | 3. Clear the debris field erection Fuzhou mobile scaffolding, when the high slope under scaffolding erection, you should first check the stability of the slope, the slope of the crisis on the stone processing, and let someone alert. 4. The height of scaffolding erection, erection foundations situation venue for scaffolding basis for processing, according to the design requirements for confirmation after passing actinomycetes positioning. 5. scaffolding erection and physical condition to participate in on-site management staff to be confirmed, where there is not a good fit for high operating personnel shall not engage in scaffolding erection and site construction management. The erection of scaffolding must be compatible with the construction schedule, a height of not more than even the erection of the wall pieces (anchor points, etc.) adjacent to the above two steps. 5. scaffolding erection, the springboard, fence, wall pieces (Anchorage, embrace wind, etc.), safety nets, ladders and other traffic must follow up. (C) Technical Requirements 1. scaffolding frame size to meet the requirements at the same time, it should meet the following safety requirements: stable (1) frame structure, the frame unit is no shortage of basic structural stability of the lever member; overall accordance with the provisions set diagonals, scissors support, wall pieces or support, pull, lift pieces; in the channel, the need to increase the size of the hole and the other (height, span) or bear the load of the site over the provisions of Fuzhou scaffolding activities, strengthening rods or constructed according to their needs. Fifth, the program review and erection of acceptance (a) program review internal construction unit 1. After you have finished verifying the program, qualified supervision report for review confirm or owners. 2. Torch scaffolding, aerial work must go through the approval of the owners of the security sector. (B) the erection of scaffolding erection acceptance 1. finished first by the construction team erected a job requirement to conduct a comprehensive self-Fuzhou steel scaffolding fasteners, notify the Department of qualified project management and construction inspection and acceptance, and for "scaffolding use permit" Conclusions for acceptance inspection personnel must sign off. Fuzhou Full scaffolding | scaffolding | scaffolding provided by Fuzhou Fuzhou Meiko Meiko steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) strong, credible, Fuzhou in Fujian site construction materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Fuzhou Mingguang Scaffolding and you hand into the brilliant, for a better future! |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

