Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
| Information Name: | Fuzhou install scaffolding, scaffolding Fuzhou, Fuzhou Mingguang scaffolding |
| Published: | 2015-03-28 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Effective measures should be taller than 50m double pipe scaffolding pole, rope stayed, unloading and other segments; 2. height of 25m above the scaffold must steel tubular scaffolding, the single pole scaffold height should be controlled within 50m and separately designed. 3. scaffold shall be designed to meet the needs of the project and indicate their purpose, the maximum static load, the maximum dynamic load and stress levels, etc; the selected design parameters and components and parts, not less than the current national and industry-related safety specifications standards. 3. Steel scaffold boards should be thick on the 3rd 2 ~ 3mm steel plate to the length of 1.4 ~ 3.6m, width 23 ~ 25cm, 5cm rib height is appropriate, should be connected at both ends of Fuzhou scaffolding rental unit, the board has a non-slip Kong, where there are cracks, distortion shall not be used. Pole, the size of the bar spacing 4. scaffolding specifically identified based on the use of scaffolding, but shall not exceed the following values: horizontal pole vertical pole large bar small bar small bar pick cantilever length 1.5m 2.0m 1.2m 1.5m 0.45m 5. ramps board, springboard slope not greater than 1: 3, the width of not less than 1.5m. 5. scaffolding inspection and acceptance of the method should be step by step, by the water segment. And in accordance with the acceptance of the main content of the preparation of inspection and acceptance form, itemized list control inspection and acceptance inspection (see table). Sixth, the use of scaffolding 1. After completion of the erection of scaffolding installation Fuzhou, unchecked issue acceptance or acceptance inspection found no rectification is completed or inadequate safety facilities, shall not be put to use. 2. prominent position in the scaffolding should hang signs stating the scaffolding through the acceptance time period of use, a number of people allowed on the scaffolding work, such as to withstand the maximum load. Fuzhou install scaffolding, scaffolding Fuzhou, Fuzhou, Fuzhou Mingguang Mingguang scaffolding provided by the steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) strong, credible, Fuzhou in Fujian site construction materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Fuzhou Mingguang Scaffolding and you hand into the brilliant, for a better future! |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

