Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736

- Product Categories
- Friendly Links
Information Name: | Fuzhou door of scaffolding, scaffolding, scaffolding Fuzhou Mingguang |
Published: | 2015-04-02 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | The erection of scaffolding must be compatible with the construction schedule, a height of not more than even the erection of the wall pieces (anchor points, etc.) adjacent to the above two steps. 5. scaffolding erection, the springboard, fence, wall pieces (Anchorage, embrace wind, etc.), safety nets, ladders and other traffic must follow up. (C) Technical Requirements 1. scaffolding frame size to meet the requirements at the same time, it should meet the following safety requirements: stable (1) frame structure, the frame unit is no shortage of basic structural stability of the lever member; overall accordance with the provisions set diagonals, scissors support, wall pieces or support, pull, lift pieces; in the channel, the need to increase the size of the hole and the other (height, span) or bear the load of the site over the provisions of the Fuzhou-speed access scaffolding, strengthen rods or constructed according to their needs. 2. Basic (ground) and bracing to withstand structure (1) on the basis of scaffolding pole (ground) should be smooth and compacted Fuzhou Bowl scaffold with sufficient bearing capacity and stability of scaffolding, located in the pit or on stage scaffolding during Fuzhou The company, pole from the pit edge station shall not be less than one meter, and the slope of the slope shall not exceed the earth's natural angle of repose, or should be done to protect and slope reinforcement. (2) under the scaffolding pole is not flat, solid or when the slope shall be provided with pedestal or pad. 6. Scaffolding width: double scaffolding transverse horizontal distance between the skin on both sides of the pole, a single row of scaffolding pole for the skin to the outer wall of the distance. 7. pole pitches (step): The distance between the upper and lower horizontal rod axis. 8. pole spacing: scaffolding pole distance between adjacent axes. 9. pole vertical distance (across): scaffolding pole longitudinal spacing. 10. Pole horizontal distance: scaffolding pole lateral spacing, a single row of scaffolding pole axis to the outer wall of the distance. Fuzhou door of scaffolding, scaffolding, scaffolding provided by Fuzhou Fuzhou Mingguang Mingguang steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) strong, credible, Fuzhou in Fujian site construction materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Fuzhou Mingguang Scaffolding and you hand into the brilliant, for a better future! |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility