Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736

- Product Categories
- Friendly Links
Information Name: | Full scaffolding scaffolding _ _ Fuzhou Fuzhou Mingguang scaffolding |
Published: | 2015-04-04 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | 4. Safety Facilities Safety scaffolding should be able to effectively provide security and prevent the occurrence of rolling objects shelves, slide and prevent personnel falling, slipping, object strikes. (1) job site safety envelope should be located and warning signs to prohibit access to the construction area; part of the scaffolding has not yet formed a stable structure or have lost temporary additional support or other reliable security measures; in the absence of reliable safety buckle hanging When the matter should be set straps or belts hanging safety net; the setting material mentioning or suspended under the facility Fuzhou door scaffold, throwing prohibited. (4) close to or through scaffolding pedestrian and transport corridors must be set up protective shed; there is a height difference of up and down the scaffolding should be located stepping entrance and fence; scaffolding ladder slip stepping in when necessary to take measures, ladders shall be provided with handrails. (C) Material Requirements 1. pipe diameter should be 48 ~ 51mm Fuzhou activities scaffolding, scaffold thickness of 3 ~ 3.5mm Fuzhou price, length of 4 ~ 6.5m and 2.1 ~ 2.8m is appropriate, there are serious rust, bend, crack damage shall not be used. 2. Fasteners should be pre-qualified to prove, where brittle deformation, slide wire shall not be used. Second, the reference 1. "water conservancy and hydropower construction and installation work safety technical regulations" (SD267-88); 2. "construction steel tubular scaffolding safety specifications" (JGJ130-2001). Third, the design requirements (a) Basic requirements 1. Important scaffolding construction plan must be developed to develop safety measures when necessary. Effective measures should be taller than 50m double pipe scaffolding pole, rope stayed, unloading and other segments; 2. height of 25m above the scaffold must steel tubular scaffolding, the single pole scaffold height should be controlled within 50m and separately designed. Full scaffolding scaffolding _ _ Fuzhou, Fuzhou, Fuzhou Meiko Meiko scaffolding provided by the steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) strong, credible, Fuzhou in Fujian site construction materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Fuzhou Mingguang Scaffolding and you hand into the brilliant, for a better future! |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility