Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736

- Product Categories
- Friendly Links
- home > Supply > Fuzhou Full scaffold construction program, Fuzhou Mingguang scaffolding (certified), scaffolding
Information Name: | Fuzhou Full scaffold construction program, Fuzhou Mingguang scaffolding (certified), scaffolding |
Published: | 2015-04-07 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | 6. Other (1) mobile hanging ladder, hanging basket: You can move the fixed ladders or hanging basket, usually located at the top of the hook slide Fuzhou scaffolding engineering or design, hanging on a solid site. (2) ladder: crossbar with a short wooden or steel scaffolding Fuzhou basket, rope tied to the crossbar, when used to make fixed at the top, a large catalytic flue pipe ramp, reactor, regenerator and other maintenance often use. (B) connecting member, the pad member 1. Fasteners: bolts fastening the snap connector member. 2. The right angle fasteners: for fastening between the vertical cross rod connection. Fifth, the program review and erection of acceptance (a) program review internal construction unit 1. After you have finished verifying the program, qualified supervision report for review confirm or owners. 2. Torch scaffolding, aerial work must go through the approval of the owners of the security sector. (B) the completion of the erection of scaffolding erection acceptance 1. Fuzhou activities scaffolding erected by the construction requirements of the job first team to conduct a comprehensive self-test, notify the Department of qualified project management and construction inspection and acceptance, and for "scaffolding permit" inspection personnel Conclusions to be signed off on acceptance. 4. scaffolding in construction need to change the original structure, increasing the height (width), instead it down with, etc., shall be subject to verification technology sector, and by the approval. (B) technical requirements for steel scaffolding materials used must meet the following requirements: 1. The pipe diameter should be 48 ~ 51mm, wall thickness 3 ~ 3.5mm, length 2.1 ~ 2.8m and 4 ~ 6.5m is appropriate, there are serious corrosion, bending, cracks, damage may not be used. 2. Fasteners should be pre-qualified to prove, where brittle deformation, slide wire shall not be used. Fuzhou Full scaffold construction program, Fuzhou Mingguang scaffolding (certified), the scaffolding provided by the Fuzhou Mingguang steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) is Fuzhou, a leader in site construction materials, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create scaffolding Fuzhou Mingguang a better future. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility