Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
| Information Name: | Minhou Full scaffolding, scaffolding, scaffolding Fuzhou Mingguang |
| Published: | 2015-04-16 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | 5. scaffolding inspection and acceptance of the method should be step by step, by the water segment. And in accordance with the acceptance of the main content of the preparation of inspection and acceptance form, itemized list control inspection and acceptance inspection (see table). Six, after use 1. scaffolding erection is complete, unchecked issue acceptance or acceptance inspection found no rectification is completed or inadequate safety facilities, shall not be put to use. 2. prominent position in the scaffolding should hang signs stating the scaffolding through the acceptance time period of use, a number of people allowed on the scaffolding work, such as to withstand the maximum load. (3) In case of strong winds, heavy rain, shock and other special circumstances, to be on the scaffolding of strength, stability, infrastructure and other specialized inspection, identify problems and timely reporting process. 4 Use the unit should be based scaffold design requirements, fair use, construction loads on the operational level shall meet the design requirements, non-overloading. And shall comply with the following requirements: (1) work surface load, including scaffold boards, personnel, tools and materials, scaffolding, when the design is not specified, the specified value should be standardized control. 5. heavy construction equipment (such as welding, etc.) shall be placed on the scaffolding, scaffold template, wind cable rope, concrete pump delivery tube shall be fixed on the scaffolding. Non-lifting equipment hanging on scaffolding. 6. scaffolding during use, do not remove the vertical primary node, the horizontal bar ponytail basket scaffolding, vertical and horizontal sweep shot, wall pieces and hold, pull, lift, lifting facilities, without the consent of the competent authorities, shall be arbitrarily change scaffolding structure, use or removal of components, such as the need to change the bent structure, should obtain the consent of the original design of scaffolding minqing activities, re-modify the design; security facilities forbidden to dismantle the scaffolding on the scaffolding leasing Lianjiang, unset or not When meet the requirements, must be added to establish or improve only after the scaffolding operations. Minhou Full scaffolding, scaffolding, scaffolding provided by Fuzhou Fuzhou Mingguang Mingguang steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) strong, credible, Fuzhou in Fujian site construction materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Fuzhou Mingguang Scaffolding and you hand into the brilliant, for a better future! |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

