Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
| Information Name: | Fuzhou how much scaffolding | scaffolding | scaffolding Fuzhou Mingguang |
| Published: | 2015-04-27 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | 5. scaffolding inspection and acceptance of the method should be step by step, by the water segment. And in accordance with the acceptance of the main content of the preparation of inspection and acceptance form, itemized list control inspection and acceptance inspection (see table). Six, after use 1. scaffolding erection is complete, unchecked issue acceptance or acceptance inspection found no rectification is completed or inadequate safety facilities, shall not be put to use. 2. prominent position in the scaffolding should hang signs Fuzhou how much scaffolding, scaffolding marked by acceptance time period of use, a number of people allowed on the scaffolding work, such as to withstand the maximum load. (B) Remove the safety requirements 1. Remove the order should be carried out step by step from the top down, up and down at the same time work is strictly prohibited. 2. Remove the stinger, connectors, springboard and other materials should be used humping scaffolding company in Fuzhou, throwing down is strictly prohibited. Has been discharged (solution) to open scaffold rods, plates, should all at once Chai Wan. 3. All wall pieces should follow step by step removal of scaffolding, the first non-whole floor or wall pieces and then removed several layers of dismantling scaffolding; segment elevation should not exceed two-step dismantling scaffolding rental Fuzhou, such as the height difference is greater than the two-step wall pieces should be added reinforcement. 3. scaffolding during use, carry out regular checks and classes before the inspection system. (1) scaffolding regular safety inspections are generally once a week, and safety checklist should be prepared according to the specific object of inspection and control content security checks itemized checklist. For scaffolding near the blasting site, should be checked after each blast. (2) pre-class work, the squad leader or class of people to deal with scaffolding inspect the scaffolding before the job after confirming safety. How much money Fuzhou scaffolding | scaffolding | scaffolding provided by Fuzhou Fuzhou Meiko Meiko steel frame construction projects Leasing Limited. Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. (www.fzmgjsj.com) strong, credible, Fuzhou in Fujian site construction materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Fuzhou Mingguang Scaffolding and you hand into the brilliant, for a better future! |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

