Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736

- Product Categories
- Friendly Links
Information Name: | Fuzhou mobile scaffolding rental | scaffolding | scaffolding Fuzhou Mingguang |
Published: | 2015-05-08 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | H- concrete lateral pressure to calculate the position of the top surface of fresh concrete total height (m). Load combinations value by fresh concrete action generated when the maximum lateral pressure on the template with the vibrated concrete beams side to side Fang and the strength, rigidity checking, and calculate the desired diameter and spacing to pull the bolt. 4. Use Excel program to calculate apparent from the above calculation, in order to design a safe, economical and viable template support, the calculation process is more complicated, you need to go through several "pro forma", ie repeated calculation. Fourth, the structural requirements (a) Pole bracket template structure should meet the following requirements: 1. the bottom of the base of each pole should be set and must be set according to the relevant provisions of the longitudinal, swept to pole. 2. High formwork pole pitches may not be greater than 1.5m, and should be set vertical and horizontal level lever. 3. The pole must be used to take a long docking fastener connection according to relevant regulations. 4. The stand upright pole should be set up, 2m vertical height tolerance of 15mm. 5. When the beam template stand pole with single pole, the pole should be located at the center line of the beam template, its eccentricity should not exceed 25mm. I. Introduction to project a commercial and residential project for the seven-frame concrete structure, Fuzhou 4.5m storey floor scaffolding Which is good, above the second floor storey 3.0m. Ramp at the entrance to the basement garage, since the first and second floor Fuzhou overhead scaffolding company, three slab in C3, C5 axis cross C-J ~ C-M-axis beam to transfer beam, the beam column scaffolding, Beam was 800 × 1800 and 600 × 1800, this project is the largest girder section. Slab surface elevation of + 7.5m, according to "Guangdong High formwork construction system construction safety management approach" provisions, a high formwork. Fuzhou mobile scaffolding rental | scaffolding | scaffolding provided by Fuzhou Fuzhou Mingguang Mingguang steel frame construction engineering Leasing Corporation. Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) strong, credible, Fuzhou in Fujian site construction materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Fuzhou Mingguang scaffolding into the brilliant and you work for a better future! |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility