Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
| Information Name: | Fuzhou scaffolding rental | scaffolding | scaffolding Fuzhou Mingguang |
| Published: | 2015-05-11 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Fourth, the structural requirements (a) Pole bracket template structure should meet the following requirements: 1. the bottom of the base of each pole should be set and must be set according to the relevant provisions of the longitudinal, swept to pole. 2. High formwork pole pitches may not be greater than 1.5m, and should be set vertical and horizontal level lever. 3. The pole must be used to take a long docking fastener connection according to relevant regulations. 4. The stand upright pole should be set up, 2m vertical height tolerance of 15mm. 5. When the beam template stand pole with single pole, pole template should be located in the beam centerline of Fuzhou where the scaffold, its eccentricity should not exceed 25mm. 4. The stent removal (1) Remove the operator must be experienced formwork review and comply with "Concrete Structures for Construction Quality Acceptance" (GB50204-2002) and other relevant regulations, strictly control the removal time how much money Fuzhou scaffolding, before form removal Chaimo apply and must have the approval. (2) should follow the first following the demolition, demolition after the first take, after take the first split scaffolding, step one clear principle Fuzhou scaffolding rental companies, the opposite order of removal and installation parts order, from top to bottom at the same time non-operation, should be dismantled use of reliable security measures. It is attached to the lifting scaffold Engineer (Lifting) for technical management of main content. Removing the program is executed after the chief supervision engineer for approval. ? Construction Ministry of Construction -------- construction adhesive lifting scaffolding Provisional Regulations govern building construction [2000] 230 number. Second, the adhesive lifting scaffolding installation supervision 1. Organization climbing frame 1) construction preparation before construction process should first be required to prepare the climbing frame according to the design of the materials is good; secondly, the building should be reserved for the design position bolt hole through the wall or embedded bolts. Fuzhou scaffolding rental | scaffolding | scaffolding provided by Fuzhou Fuzhou Mingguang Mingguang steel frame construction engineering Leasing Corporation. Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) strong, credible, Fuzhou in Fujian site construction materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Fuzhou Mingguang scaffolding into the brilliant and you work for a better future! |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

