Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
| Information Name: | Fuzhou scaffolding rental | Fuzhou Mingguang Scaffolding (certified) | scaffolding |
| Published: | 2015-05-12 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | (V, template support construction 1. Construction preparation: carry out technical tests; acceptance of the components and parts; clear the debris site erection, erection site leveling, and drainage flow 2. The bracket base must meet the formwork construction and computing requirements, acceptance. After passing the required construction program of actinomycetes positioning. Due to support the erection of the chute, the slope of 14.6%, therefore, before the erection of the pole, the first release plan based on the location of each pole formwork, then no chipping chute less than 150 × 150 plane Fuzhou where the scaffold to ensure mounting base surface level scaffold factory in Fuzhou, ensure vertical pole .3 according to the construction plan and construction requirements for the erection of the above template support, and should meet the "Concrete Structures for Construction Quality Acceptance" (GB50204-2002) the relevant provisions. All the windows must be closed within 5 construction, lock, does not allow open outwards or outwardly pick items .6 demolition staff entering into the job after the first inspection, reinforcement of loose parts, The material layer to stay within clear steps, objects and clean up all the garbage block was delivered to the ground should be safe, non-high throw .7 procedures by the erection of the anti-demolition Fuzhou scaffolding rental companies, namely: safety net - vertical block fence - 6. When the pole concrete pouring, the deformation of the scaffolding to send a full-time security staff to observe and support template touch system found anomalies - Pad exhibition fence - protective railings - joists - oblique rod - double wall bar - a large bar. Construction should be suspended immediately, rapid evacuation of personnel, to be excluded by the danger and the person in charge of construction site safety checks before they return to work after the consent 7. During the construction period, to avoid the material, equipment and tools piled too concentrated. 8. Scaffording personnel must be certified and wear a helmet, seatbelt, wear non-slip shoes 9. The bad weather should stop the erection and removal of the template holder shelves rain Fuzhou job should anti-slip scaffolding rental |... Fuzhou Mingguang Scaffolding (certified) | scaffolding by Fuzhou Mingguang steel frame construction engineering Leasing Co., Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) is Fuzhou, leading site construction materials, over the years, the company implement the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs in Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create Fuzhou Mingguang scaffold better future. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

