Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
- home > Supply > Fuzhou price mobile scaffolding | scaffolding Fuzhou Mingguang (certified) | scaffolding
| Information Name: | Fuzhou price mobile scaffolding | scaffolding Fuzhou Mingguang (certified) | scaffolding |
| Published: | 2015-05-13 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | 4. The stent removal (1) formwork removal must be considered reviewed, and in line with the experience "Construction Quality Acceptance of Concrete Structure Engineering" (GB50204-2002) and other relevant regulations, strictly control the removal time before the scaffolding company in Fuzhou, form removal must There Chaimo applications and the approval. (2) should follow the first following the demolition, the demolition of the scaffolding after the first take, after take the first split Fuzhou price mobile scaffolding, step one clear principle, order and install parts removed in reverse order, from top to bottom at the same time non-operating Fuzhou hire scaffolding, Demolition should adopt reliable security measures. 8. The surface does not allow the removal or separation of the upper and lower two-step while dismantling (stepping type) do serious step in a clear, a clear one. 9. All wall or pole, oblique rod, quarantine measures, measures must climb over scaffolding layer removal step simultaneously drop, allowed first removed. 10. All rods and fasteners, should be dismantled in isolation, does not allow attachment fastener delivery on the ground rods, or two shots at the same time remove the transport ground. 11. All exhibition fence pad removal, moving from outside to inside should erect to prevent post-flips out from the inside, wounding fence face garbage objects fall from a height. Supervision Scaffolding (c) floor-standing scaffolding outside manipulative use of services and withstand a certain load of features, almost all on-site engineering and manipulation of staff are in use, different types, different requirements of different construction stages, on scaffolding to change. As the scene was not a strict system of governance will cause indiscriminate use of arbitrary change, and security incidents have occurred this phenomenon. The use of scaffolding governance should be strengthened. 14. site scaffolding should implement dynamic management, all changes must take dismantle apply to the total package, approved by the Executive Commissioner. Fuzhou price mobile scaffolding | scaffolding Fuzhou Mingguang (certified) | scaffolding provided by the Fuzhou Mingguang steel frame construction engineering Leasing Corporation. Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) is Fuzhou, a leader in site construction materials, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create Fuzhou Mingguang scaffold better future. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

