Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
| Information Name: | Scaffolding rental, Fuzhou Mingguang Scaffolding (certified), Fuzhou scaffolding |
| Published: | 2015-06-03 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | 15. The rules and regulations must improve and strengthen norms of governance, deter and DU to make illegal command and illegal operations. 16. It is important to improve the quality of self-protection awareness and protection measures and progress in applying the tube staff. 17. Engineer should find to stop the indiscriminate use of scaffolding phenomenon: 1) was added to the staff and material be increased, causing overload; 2) to frame any demolition rod accessories and Rachel; 3) arbitrarily deprived, reduce operational level scaffold board IV. construction requirements (a) Pole bracket template structure should meet the following requirements: 1. the bottom of the base of each pole should be set and must be set according to the relevant provisions of the longitudinal, swept to pole. 2. High formwork pole pitches may not be greater than 1.5m scaffold rental, and should be set vertical and horizontal level lever. 3. The pole must be used to take a long docking fastener connection according to relevant regulations. 4. The stand upright pole should be set up, 2m vertical height tolerance of 15mm. 5. When the beam template bracket scaffold pole with single pole price, the pole should be located at the center line of the beam template, its eccentricity should not exceed 25mm. Because wood Fang are generally long length 2m, so the design when the vertical distance between the axis of the beam can be settled, generally 1 / 2,1 / 4, or slightly smaller than the 2m, and along the beam axis of the pitch will have determined by the spreadsheet. 4. Construction of the vibration generated by large loads, supported by vertical steel tubular scaffold consisting of scaffolding, and the error is difficult to ensure the installation of the vertical bars in a line, and therefore steel tubular scaffold to be neat and straight, and to promptly install a good aspect to the horizontal rod, scissors and so on. Upper and lower pole with the docking fastener specifications should be staggered. Scaffolding rental, Fuzhou Mingguang Scaffolding (certified), Fuzhou, Fuzhou Mingguang scaffolding provided by the steel frame building works Leasing Corporation. Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) is Fuzhou, a leader in site construction materials, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create Fuzhou Mingguang scaffold better future. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

