Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736

- Product Categories
- Friendly Links
Information Name: | Mobile scaffolding, scaffold Fuqing, Fuzhou Mingguang scaffolding |
Published: | 2015-06-30 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | 3, scaffolding structure, with initial defect member, such as rod initial bend, rust, scaffolding leasing companies, erection size error, eccentricity etc. Loaded bigger; 4, and the wall of the connection point of the scaffold binding variation compared with Big. Research on the above issues and the lack of systematic accumulation of statistics, probability does not have an independent analysis of the condition, hire scaffolding, so the structural resistance multiplied by the adjustment factor is less than 1 by its value system and safety factor previously used for calibration OK. Therefore, the design method used in this specification is essentially a semi-probabilistic, semi-empirical. Scaffolding constructed to meet the requirements of this specification is the basic condition for the design calculations. Process 1, stand erection process: on a solid foundation elastic line, pole positioning sweep shot → → placed upright pole and loaded with the sweep shot fastening → sweeping a small bar, and with the pole and sweep shot fastening → The first step in a large bar and fitted with pole fastening → Security → Security Step Step small bar ledger → Security → Step small bar as temporary diagonal brace, Fuqing scaffolding, upper Step fastened with a large bar (installation and post-column connecting rod removal) → safe third, four-step large bar and small bar → Install floor and connected pole post rod → → plus set cut Supporter → laying scaffold boards, lashing protection and file feet, stand hanging safety net. Acceptance of scaffolding erection and assembly has been completed, shall be subject to inspection and acceptance can be carried out to confirm the job after passing. Should be step by step, by the foreman in charge of internal pipeline stages, shelves group leaders and technical staff along with full-time security organization acceptance, and acceptance of a single fill. Acceptance requirements are as follows: 1, basic treatment scaffolding, practice, embedment depth must be accurate and reliable. 2, shelf arrangement, pole, size bar spacing should meet the requirements. 3, shelf erection and assembly, including the tool holder and a selection from the focus should meet the requirements. Mobile scaffolding, scaffold Fuqing, Fuzhou, Fuzhou Mingguang Mingguang scaffolding provided by the steel frame building works Leasing Corporation. Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) strong, credible, Fuzhou in Fujian site construction materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Fuzhou Mingguang scaffolding into the brilliant and you work for a better future! |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility