Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736

- Product Categories
- Friendly Links
Information Name: | _ Fuzhou Mingguang scaffolding hire scaffolding (Online) _ Minhou scaffolding |
Published: | 2015-07-01 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | 3, scaffolding structure, with initial defect member, such as rod initial bend, rust, erection size error, eccentricity etc. Loaded bigger; 4, and the connection point of the wall, scaffold rental, scaffold binding to large variation . Research on the above issues and the lack of systematic accumulation of statistics, probability does not have an independent analysis of the conditions, Minhou scaffolding, so the structural resistance multiplied by the adjustment factor is less than 1 by its value system and safety factor previously used for calibration OK. Therefore, the design method used in this specification is essentially a semi-probabilistic, semi-empirical. Scaffolding constructed to meet the requirements of this specification is the basic condition for the design calculations. 4, the overall structure of a "building block" modular design, scaffolding fasteners, without any installation tools. Aluminum quick scaffold solve business problems high-altitude operations, it may be based on the actual needs of highly overlap with 2.32M / 1.856M / 1.392M three heights specifications. There are two kinds of wide and narrow width type specifications. Narrow frame in narrow ground lap, convenient and flexible. He meets the wall corner, scaffolding leasing companies, stairs and other high-altitude operations at narrow space requirement is a good helper for enterprise Spider-Man. 7, scaffolding erection of buildings should be higher than 1.5m above the top or the operation surface, and setting up the envelope. 8, steel erection completed scaffolding, fasteners, scaffold boards and connection points are not free to be removed. When the construction is necessary, it must be approved by the site responsible for the consent and take effective measures after the process is completed, immediately restored. 9, before the scaffolding before use by the organization responsible for the site inspection and acceptance, acceptance and complete inspection on order. During the construction process should be professional management, inspection and warranty, and regular settlement observed abnormal reinforcement measures should be taken. _ Fuzhou Mingguang scaffolding hire scaffolding (Online) _ scaffolding provided by the Fuzhou Minhou Mingguang steel frame construction engineering Leasing Corporation. Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) is Fuzhou, a leader in site construction materials, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create Fuzhou Mingguang scaffold better future. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility