Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736

- Product Categories
- Friendly Links
Information Name: | Fuzhou scaffolding | scaffolding Mingguang Fuzhou | Fuzhou scaffolding installation |
Published: | 2015-07-06 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | ③ semi-closed: block area accounts for 30% to 70% of the scaffolding. ④ partial closure: block area of ??less than 30%. 6. Other ① ladder: Hang dry with a short stick or pipe, rope tied to the crossbar, when used to make fixed at the top, is often used when servicing large catalytic flue, reactor, regenerator, inclined tubes. ② mobile hanging ladder, hanging basket: You can move the fixed ladders or scaffolding hanging basket Fuzhou, usually located at the top hook or install scaffolding set up Fuzhou slide, hanging on a solid site. 10, when the scaffolding removed, check the connection with the building and clear the remaining material on the scaffolding, debris clean from top to bottom, according to the first installed after the demolition, installed after the first demolition order, removal of Material should be harmonized passed down or lifted to the ground, a clear step. Not allowed to use stepping split method, non-down throw or push (pull) down method removed. 11, take dismantle the scaffolding, set the warning area, and sent people alert. In case of more than six high winds and bad weather, it should stop Scaffolding dismantling work. 16, work is important Fuzhou hire scaffolding, safety, life is more important, be sure to keep in mind the above. Erection 1, strut-type cantilevered scaffolding erection strut-type cantilevered scaffolding erection requirements need to control the use of load, erection should be strong. When the erection should be a good erection in the rack, so the bar protruding wall, then tilt rods propped up with scaffolding pick crossbar is securely connected Fuzhou price, followed by the erection of the cantilevered portion, shop scaffold boards, railings and peripherals to block feet, below support safety net to ensure safety. Scaffolding Fuzhou | Fuzhou Mingguang scaffolding | scaffolding installed by Fuzhou Fuzhou Mingguang steel frame construction engineering Leasing Corporation. Fuzhou scaffolding | scaffolding Mingguang Fuzhou | Fuzhou, Fuzhou Mingguang scaffolding installed steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) this year introduced a new upgrade, the above picture is for reference only, please call the contact picture on this page or telephone obtain the latest information, contact: Mr. phase. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility