Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
- home > Supply > Fuzhou scaffolding installation, Fuzhou Mingguang Scaffolding (certified), Fuzhou scaffolding
| Information Name: | Fuzhou scaffolding installation, Fuzhou Mingguang Scaffolding (certified), Fuzhou scaffolding |
| Published: | 2015-07-07 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | 3, scaffolding structure, with initial defect member Fuzhou scaffolding manufacturers, such as initial rod bent, corroded, erection size error, eccentricity etc. Loaded bigger; 4, and the connection point of the wall, on the scaffold binding large variation . Research on the above issues and the lack of systematic accumulation of statistics, probability does not have an independent analysis of the condition, so the structural resistance multiplied by the adjustment factor is less than 1 by its value system and safety factor previously used for calibration OK. Therefore, the design method used in this specification is essentially a semi-probabilistic, semi-empirical. Scaffolding constructed to meet the requirements of this specification is the basic condition for the design calculations. 16, work is important Fuzhou scaffold price, safety, life is more important, be sure to keep in mind the above. Erection 1, strut-type cantilevered scaffolding erection strut-type cantilevered scaffolding erection requirements need to control the use of load, erection should be strong. When the erection should be a good erection in the rack, so the bar protruding wall, then oblique stilted and pick the crossbar is securely connected, followed by the erection of the cantilevered portion, shop scaffold boards, railings and peripherals to block feet, The following support safety net to ensure safety. Characteristics of different types of construction chosen for different uses scaffolding and formwork bracket. Use the bowl - scaffold bridge support bracket majority, but also the use of scaffolding door. Construction of the main structure of the floor scaffolding fastener scaffolding scaffolding leasing companies mostly Fuzhou, scaffolding pole vertical distance is generally 1.2 ~ 1.8m; horizontal distance is generally 0.9 ~ 1.5m. Compared with the general structure of the scaffold, their working conditions with the following characteristics: 1, suffered a greater load variability; 2, fasteners connecting node is semi-rigid and rigid node size and fastener quality, installation quality related to the presence of node performance large variation; Fuzhou scaffolding installation, Fuzhou Mingguang Scaffolding (certified), Fuzhou, Fuzhou Mingguang by scaffolding steel frame construction engineering Leasing Corporation. Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) is Fuzhou, a leader in site construction materials, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create Fuzhou Mingguang scaffold better future. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

