Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
| Information Name: | Scaffolding Fuzhou | Fuzhou Mingguang scaffolding | scaffolding factory in Fuzhou |
| Published: | 2015-07-08 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Process 1, stand erection process: on a solid foundation elastic line, pole positioning sweep shot → → placed upright pole and loaded with sweeping sweeping rod fastened → Fuzhou scaffolding installed a small bar, and the pole and the sweep shot The first step fastening → fitted with a large bar and pole fastening → Security → Security Step Step small bar ledger → Security → Step small bar as temporary diagonal brace, upper Step fastened with a large bar (installation and post-column connecting rod removal) → safe third, four-step large bar and small bar → Install floor and connected pole post rod → → plus set cut Supporter → laying scaffold boards, lashing protection and file feet, stand hanging safety net. According to the setting of a wall or pole and load size, the common open double scaffolding pole horizontal distance is generally 1.05 ~ 1.55m, masonry scaffolding stride generally 1.20 ~ 1.35m, decoration or masonry, decorative dual-use scaffolding general Fuzhou scaffold price of 1.80m, pole vertical distance 1.2 ~ 2.0m. Which allows the erection height of 34 ~ 50m. When a single row set Fuzhou hire scaffolding, pole horizontal distance of 1.2 ~ 1.4 m, pole vertical distance 1.5 ~ 2.0m. Allow erection height of 24m. Fuzhou scaffolding, shall be subject to inspection and acceptance confirmation conducted only after passing the acceptance scaffolding erection and assembly has been completed. Should be step by step, by the foreman in charge of internal pipeline stages, shelves group leaders and technical staff along with full-time security organization acceptance, and acceptance of a single fill. Acceptance requirements are as follows: 1, basic treatment scaffolding, practice, embedment depth must be accurate and reliable. 2, shelf arrangement, pole, size bar spacing should meet the requirements. 3, shelf erection and assembly, including the tool holder and a selection from the focus should meet the requirements. Scaffolding Fuzhou | Fuzhou Mingguang scaffolding | scaffolding factory in Fuzhou, Fuzhou Mingguang by steel frame construction engineering Leasing Corporation. Scaffolding Fuzhou | Fuzhou Mingguang scaffolding | scaffolding factory in Fuzhou, Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) this year introduced a new upgrade, the above picture is for reference only, please call the contact picture on this page or telephone obtain the latest information, contact: Mr. phase. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

