Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736

- Product Categories
- Friendly Links
- home > Supply > _ Fuzhou Fuzhou scaffolding installation Mingguang Scaffolding (certified) _ Fuzhou scaffolding
Information Name: | _ Fuzhou Fuzhou scaffolding installation Mingguang Scaffolding (certified) _ Fuzhou scaffolding |
Published: | 2015-07-21 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | 10, when the scaffolding removed, check the connection with the building, and the remaining material on a scaffolding, debris cleaned from top to bottom, according to the first installed after the demolition, installed after the first demolition order, Fuzhou scaffolding , removal of the material should be uniform or lifting passed down to the ground, a clear step. Not allowed to use stepping split method, non-down throw or push (pull) down method removed. 11, take dismantle the scaffolding, set the warning area, and sent people alert. In case of more than six high winds and bad weather, it should stop Scaffolding dismantling work. 2, Rachel frame body and buildings (flexible Rachel) using Φ6 steel, top support, consisting of steel and other components, including steel in tension, pressure from the top support, steel and other delivery. 3, safety nets (1) Hangings requirements: strict safety net should be hanged, Fuzhou scaffold price, with a plastic banding contempt firm, not leak lashing eyes, two network connections should be tied to the same bars. Set up a safety net to hang on the inside of the scaffolding. (2) according to the acceptance criteria between layers of scaffolding and construction set the closed net, to prevent debris falling. 4) large carrying capacity: pole socket connection is concentric cross bar with pole by Bowl header, connector with reliable bending, shear, torsional mechanical properties. And each rod axis intersect at one point, the node in the frame plane, therefore, the structure solid and reliable, large capacity. (Full rack capacity is improved, compared with the same clear about the status of steel tubular scaffold increased by more than 15 percent, Fuzhou scaffolding manufacturers) 5) Safe and reliable: joint design, taking into account the Bowl spiral friction and self-gravity, the joint with a reliable self-locking ability. Loads acting on the rail to pass through to the next pole Bowl, Bowl under a strong shear capacity (up to 199kN). _ Fuzhou Fuzhou scaffolding installation Mingguang Scaffolding (certified) _ Fuzhou scaffolding provided by the Fuzhou Mingguang steel frame construction engineering Leasing Corporation. Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) is Fuzhou, a leader in site construction materials, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Fuzhou Mingguang scaffolding leadership with the staff warmly welcome all inquiries negotiations to create Fuzhou Mingguang scaffold better future. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility