Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636736
| No.13636736
- Product Categories
- Friendly Links
- home > Supply > Scaffolding Fuzhou | Fuzhou Mingguang scaffolding | scaffolding rental company in Fuzhou
| Information Name: | Scaffolding Fuzhou | Fuzhou Mingguang scaffolding | scaffolding rental company in Fuzhou |
| Published: | 2015-07-23 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Cuplock 1, advantages 1) Versatile: according to the specific construction requirements, consisting of different groups frame size, shape scaffold works and the carrying capacity of a single, double scaffolding, supports, Fuzhou scaffolding, support columns, materials Construction equipment lifting frame, Fuzhou Scaffolding rental, climbing scaffolding, cantilever racks, and other functions. It can also be used to build facilities shed, feed shed, lighthouse and other structures. Particularly suitable for the erection of scaffolding and heavy support frame surface. 2, wall pieces are set according to the axis of the size of the building, across the horizontal direction every 3 (6m) set one up. In the vertical direction should be every three to four meters to set a, and ask the points are staggered to form a plum-shaped arrangement, and even the erection of a wall element method and the same floor scaffolding. 3, the vertical control erection, to strictly control the vertical segment of the scaffolding, vertical degree tolerance: 4, laying the underlying scaffold scaffold boards should be paved thick wooden scaffold boards on which layers of a thin steel plate punched into a shop full of perforated lightweight scaffold boards. Generally less than 400mm appropriate (in the new specification may be amended), generally the uppermost and lowermost step by step maximum force, Fuzhou factory when scaffolding pole calculation should be calculated as a major point. When dissatisfied group carrying capacity requirements should be increased to reduce the vertical and horizontal spacing of the pole, Fuzhou scaffolding sell, reduce or increase the horizontal bar pitches. (2) Domestic scaffolding widespread substandard steel, fasteners, and other materials backwater and the end of care quality, the actual construction of the theoretical calculation does not take into account these, it is best to take certain safety factor in the design calculations. Scaffolding Fuzhou | Fuzhou Mingguang scaffolding | scaffolding rental company in Fuzhou, Fuzhou Mingguang by the steel frame building works Leasing Corporation. Scaffolding Fuzhou | Fuzhou Mingguang scaffolding | scaffolding rental company in Fuzhou, Fuzhou Mingguang steel frame building works Leasing Co., Ltd. (www.fzmgjsj.com) this year introduced a new upgrade, the above picture is for reference only, please call the contact or pictures on this page phone, for the latest information, contact: Mr. phase. |
Admin>>>
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 42085 visitor
Copyright © GuangDong ICP No. 10089450, Fuzhou Mingguang steel frame construction projects Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

